Jan. 31, 2019
Toyo Engineering Korea Limited (Toyo-Korea, President and CEO Toru Osanai), a Korean subsidiary of Toyo Engineering Corporation has been awarded Engineering, Procurement and Construction project from Bangkok Synthetics Company Ltd. (BST), a major C4 downstream product manufacturer of Thailand. This project involves construction of 1,3-Butadiene & Butene-1 production units total capacity of 80 KTA & 34 KTA, respectively, at BST’s existing petrochemical complex in Map Ta Phut, Rayong, Thailand. The plant is scheduled for completion in 2021.
This is an EPC project following the Front End Engineering Design (FEED) contract awarded to Toyo-Korea at the end of 2017.
Contract Summary
Client | Bangkok Synthetics Company Limited (BST) |
---|---|
Contractor | Toyo Engineering Korea Limited (Toyo-Korea) |
Site | Map Ta Phut, Rayong, Thailand |
Facilities | 1,3-Butadiene (80 KTA) & Butene-1 production units (34 KTA) |
Contract Type | Turnkey lump sum for detailed engineering, procurement, and construction |
Completion | 2021 (scheduled) |